PROCESS

From Requirement to Reliable Operation

A structured engineering process that takes every project from understanding the requirement through design, fabrication, installation, testing, commissioning, and ongoing support.

Process architecture

Seven stages. One accountable process.

Each stage is planned around the gas, pressure, flow, equipment, site and operational requirements of the application.

01
Understand

Requirement & Site Assessment

Understand the application, gas requirements, operating conditions, existing infrastructure.

02
Engineer

Design & Engineering

Develop layouts, line sizing, equipment selection, piping arrangements.

03
Plan

Equipment & Project Planning

Plan tanks, manifolds, regulators, valves, vaporizers, pipelines, controls.

04
Build

Fabrication & Assembly

Manufacture and assemble gas handling equipment using suitable materials.

05
Install

Installation & Integration

Install pipelines, tanks, manifolds, vaporizers, controls and equipment.

06
Test & Commission

Testing & Commissioning

Perform pressure and leak testing, inspection, functional checks.

07
Support

Maintenance & Ongoing Support

Provide preventive maintenance, troubleshooting, inspection, servicing, repairs, AMC support.